Sales quoting
How long should a quote be valid? Prices, deposits and price clauses
Most UK quotes say they are valid for 30 days, and most firms have never asked whether 30 is the right number. Here is how to choose a validity period, protect yourself when prices move and stay fair to the customer.
A roofing contractor in Norwich quoted a church hall in March. The trustees accepted in July. By then the lead flashing and timber had both gone up, and the margin on the job had all but disappeared. The quote said "valid for 30 days", but nobody had checked the date when the signed copy came back, and the contractor felt it would look petty to re-price a charity.
Validity periods exist for exactly that moment. They only work if you choose them deliberately and then enforce them.
Why validity matters more than it used to
Material prices do not sit still. The Department for Business and Trade's monthly building materials statistics show the "All Work" material price index rose 7.2% in the year to September 2026. Some items moved much faster. Fabricated structural steel rose 19.9%, rigid pipes and fittings 16.9% and steel reinforcing bars 16.1%. A few went the other way: imported sawn wood fell 1.9% and ready-mixed concrete 0.5%.
The averages hide the risk. If your job is mostly steel or copper, a quote that is three months old can be badly wrong even when the headline index looks calm.
Choosing a validity period
There is no legal standard. Pick a period that matches how fast your costs move and how long your customers take to decide.
| Type of work | Typical validity | Why |
|---|---|---|
| Small domestic repairs, labour-heavy | 30 days | Few materials, quick decisions |
| Kitchens, bathrooms, extensions | 14 to 30 days, with a materials clause | Volatile items, long decisions |
| Commercial fit-out or M&E packages | 30 to 60 days, priced against supplier quotes | Supplier prices often hold for a set period |
| Service and maintenance contracts | 30 to 90 days | Mostly labour, budget cycles are slow |
| Public-sector tenders | As the buyer specifies | Set in the tender documents |
Two habits make any period work. First, align your validity to your suppliers' quotes. If your merchant holds steel prices for 14 days, quoting 60 days with no clause is a gamble. Second, put the expiry as a date, not a number of days. "Valid until 12 December 2026" is harder to misread than "30 days from issue".
Price adjustment clauses
Where a job will take months, or start a long time after acceptance, a fixed price can be unfair to you. A price adjustment clause shares the risk. Common forms are:
- Named-item clause. The price is fixed except for listed volatile items, such as copper cylinder or structural steel, which are charged at cost on the day of order plus your stated margin.
- Index-linked clause. The price moves in line with a published index between the quote date and the order date, using a stated formula.
- Provisional allowance. A sum is included for an item that cannot be priced yet, with the actual cost charged when known.
With consumers, be careful. Under the Consumer Rights Act 2015, a term that lets the trader set the price after the consumer is bound, or raise it without letting the consumer cancel if the final price is too high, is on the list of terms that may be unfair (Schedule 2, paragraphs 14 and 15). An unfair term does not bind the consumer. There is an exception for a lawful price-indexation clause where the way prices vary is explicitly described (paragraph 25). Written terms must also be transparent, which means plain, intelligible and legible (section 68).
In practice that means: name the items, name the index or the method, show an example, and give the homeowner a way out if the increase is large. A clause that says "prices may change" is the kind a customer can ignore.
Deposits that lock the price
The simplest protection is to let customers lock the price. Offer a choice on the quote: pay a deposit now and the price for materials is fixed, or accept without a deposit and the materials clause applies at the date of order.
The deposit should be enough to order the volatile items on acceptance. Many firms ask for 25% to 50%, or the cost of the special-order materials in full. Our guide to taking deposits on UK quotes covers terms and late payment.
Once you have the money, order the materials. A deposit that sits in the bank while the merchant's price rises protects nobody.
What "subject to survey" really means
"Subject to survey" tells the customer the price is provisional until you have inspected properly. Used honestly, it is fair. Used vaguely, it reads like an escape hatch, and customers treat it that way.
Make it specific:
- Say what the survey checks. Roof timbers, drainage runs, the condition of the existing consumer unit.
- Say what could change. "If the survey finds rot in more than two rafters, replacement will be quoted separately at £X per rafter."
- Say when it happens. Before any deposit is taken, or before materials are ordered.
- Confirm in writing afterwards. Either "survey complete, price confirmed" or a revised quote for acceptance.
Darren, a surveyor-turned-builder in Swindon, ends every survey with a short message that says one of two things: price confirmed, or here is the change and why. His customers say it is the most reassuring part of the job.
Validity and price changes in QuoteCloud
QuoteCloud keeps the commercial rules visible in the document, rather than buried in a footer.
- Build quotes from templates for itemised online estimates, with the expiry date, survey conditions and any materials clause set out on the first page.
- Keep your price adjustment and survey wording consistent by locking approved terms, so a busy estimator cannot edit them away.
- Offer "fix the price with a deposit" as an option in the pricing table. The customer ticks it, signs and pays the deposit from the quote by card through Stripe or by PayPal.
- When a supplier changes prices, update your catalogue with bulk price updates so every new quote uses the current figures.
- Statuses show Sent, Opened, Accepted, Part Paid and Paid, so the office can see which quotes are near expiry and still unanswered.
This is general information, not legal advice. If you would like help setting up validity dates and price clauses in your templates, contact us.
Sources
- DBT: construction building materials commentary, October 2026
- Consumer Rights Act 2015, Schedule 2: consumer contract terms which may be regarded as unfair
- Consumer Rights Act 2015, section 62: requirement for contract terms and notices to be fair
- Consumer Rights Act 2015, section 68: requirement for transparency
See it working with your own quote
Send us a quote, proposal or web page you use today. We will show you what it looks like in QuoteCloud or WebDirector on a short video call, at a time that suits UK hours.



