Industry guide
Heat pump quotes that win: options, BUS grants and clear pricing
A heat pump is a big, unfamiliar purchase, and the quote is where most homeowners decide whether to trust you. Clear options, the grant shown properly and honest running-cost assumptions win more jobs than a single bottom-line figure.
Homeowners comparing heat pump quotes are usually comparing three or four documents that look nothing alike. One is a single page with a total. One is a 20-page technical report. One mentions the grant, another does not. The installer who makes the decision easy often wins, even if they are not the cheapest.
Here is how to structure a low-carbon heating quote that homeowners can follow.
Start with the home, not the kit
Before any prices, show that you understand the property. A short summary at the top builds confidence:
- the property type, size and current heating system
- the heat loss figure and how you calculated it
- the recommended heat pump capacity
- any changes needed, such as larger radiators, a new cylinder or pipework
- where the outdoor unit will sit, and any planning or noise checks
This is also the place to explain the difference between a heat pump and the boiler they have now, in plain words. Lower flow temperatures, longer running times and radiators that feel warm rather than hot are all things customers worry about after installation if nobody told them first.
Offer good, better, best
People find it easier to choose between options than to say yes or no to one price. Three well-built options also stop the customer shopping each line item around.
| Option | What it might include | Why someone picks it |
|---|---|---|
| Good | Heat pump sized to the heat loss, new cylinder, essential radiator upgrades | Lowest upfront cost |
| Better | As above, plus more radiator upgrades for lower flow temperatures and a smart control package | Better efficiency and comfort |
| Best | As above, plus extended warranty, upgraded cylinder and a monitoring service | Longest-term peace of mind |
Keep the difference between options clear and genuine. If "Better" is the one you would install in your own home, say so and explain why.
Add-ons can sit beside the main options: a solar PV quote, loft insulation, or removal of an old oil tank. Let the customer choose them separately rather than bundling everything into one figure.
Show the Boiler Upgrade Scheme grant properly
The Boiler Upgrade Scheme (BUS) is open in England and Wales. Scotland has its own support, and Northern Ireland's boiler replacement scheme is closed. Current grant amounts on GOV.UK are:
| Technology | Grant |
|---|---|
| Air source heat pump (air-to-water) | £7,500 |
| Ground source heat pump (including water source) | £7,500 |
| Air-to-air heat pump (residential only) | £2,500 |
| Biomass boiler | £5,000 |
There is also an additional £1,500 for an air source or ground source heat pump, available until March 2027, if the property is heated by oil or LPG and has no mains gas connection.
A few rules affect how you quote:
- The installer applies. Your MCS-certified business applies for the grant on the homeowner's behalf through Ofgem. Installers must be MCS certified to take part.
- The grant comes off the price. GOV.UK says the grant value is taken off the amount the customer pays, and should appear on the quote and the invoice.
- There are limits. One grant per property. Hybrid heat pump systems are not eligible, and the grant cannot be used to replace an existing low-carbon heating system. Most new builds and social housing are excluded.
- Timing matters. The installer must commission and install the system within 120 days of applying.
On the quote, show the full price, then the grant as a clear deduction, then the amount the customer pays. Do not hide the grant inside a lower line price. Customers comparing quotes need to see like with like.
| Better option, air source heat pump | Amount |
|---|---|
| Supply and installation, zero-rated | £13,200 |
| Boiler Upgrade Scheme grant | −£7,500 |
| You pay | £5,700 |
Laid out like this, a homeowner can compare your figure with another installer's in seconds, and see the grant has been passed on in full.
Get the VAT right
For installation in residential accommodation, heat pumps are zero-rated in Great Britain and Northern Ireland until 31 March 2027. HMRC's manual says the reduced rate of 5% applies from 1 April 2027. Supplying materials without installing them does not get the relief.
If your quote is valid for several months, or the installation might happen after 31 March 2027, say which VAT rate you have assumed.
Be honest about running costs
Running-cost estimates win and lose jobs, and they cause complaints when they are wrong. State your assumptions: the electricity tariff, the expected efficiency, the household's heat demand. Present them as estimates, not promises. A customer who understood the assumptions is far less likely to feel misled later.
Make the next step obvious
A strong heat pump quote ends with a clear route to yes:
- Choose an option and any extras.
- Confirm eligibility details for the grant.
- Sign and pay the deposit.
- Book the survey or installation date.
If you are quoting a homeowner, remember their 14-day cancellation right under the Consumer Contracts Regulations 2013, and include the cancellation information with your quote.
Building interactive heat pump quotes in QuoteCloud
QuoteCloud quotes are interactive web documents, which suits a decision like this. Many HVAC and heating businesses build their heat pump template like this:
- Options the customer can choose. A pricing table with Good, Better and Best as options, and extras such as smart controls or a cylinder upgrade as optional items. The total updates as the customer chooses.
- The grant as its own line. A discount line for the BUS grant, so the full price, grant and amount payable are always visible.
- VAT per line. Set up a zero-rated tax rate for qualifying installation and standard rate for anything that does not qualify.
- Explaining the technology. Image, video and FAQ blocks to show how a heat pump works, where the unit will go and what to expect in winter.
- Signature and deposit. eSignature and a card deposit through Stripe or PayPal when the customer accepts.
You get a notification when the homeowner first opens the quote, and the document moves through Opened, Accepted and Part Paid. That tells you when to follow up and when to order the kit. See how document tracking works.
This is general information, not legal or tax advice. Grant rules change, so check the latest Ofgem and GOV.UK guidance before each quote.
If you would like a heat pump quote template with options and the grant built in, see a QuoteCloud demo or contact us.
Sources
- Apply for the Boiler Upgrade Scheme (GOV.UK)
- Boiler Upgrade Scheme: what you can get (GOV.UK)
- Boiler Upgrade Scheme: check if you're eligible (GOV.UK)
- Boiler Upgrade Scheme: how to apply (GOV.UK)
- Boiler Upgrade Scheme (Ofgem)
- VENSAV2083: VAT rates for energy-saving materials (HMRC manual)
- Consumer Contracts Regulations 2013 (legislation.gov.uk)
See it working with your own quote
Send us a quote, proposal or web page you use today. We will show you what it looks like in QuoteCloud or WebDirector on a short video call, at a time that suits UK hours.



